Sept 2007 Status Report
Muslim Cemetery Improvement Project
Denton, Texas

Phase 1 Expenses - COMPLETED
  • $74,966 raised in July of 2000.
  • $52,500 spent on concrete roads (70% complete). (20,400 sq. ft completed @ $2.57
    per sq. ft.) - click here for satellite picture of road
  • $16,000 spent on water well drilling, installation and water dispensing area.
  • $5,253 spent to install electricity.
  • $7,275 spent on the geotechnical survey to identify the land suitable for burial, and to
    identify the land to be used for concrete roads and parking lots.

Phase 2 Expenses - NEEDED
  • $29,000 to complete remaining 9,200 sq. ft. concrete road.
  • $6,500 to replace water well pump - COMPLETED on 9/5/07
  • $30,000 to construct washrooms, restrooms, storage room, and septic system.

TOTAL FUNDS REQUESTED:  $59,000

If you would like to make a donation on-line using a major credit card,
please click on the PayPal button below.




Or, if you would like to make a donation by check, please mail to the
address below:

Muslim Cemetery, Inc.
P.O. Box 2629
Denton, TX 76202

* NOTE:  Donations to Muslim Cemetery, Inc. are tax deductible
and you will be mailed a receipt for your donation.